For example, a license with an expiration date of 3/31/2012 (2012 Renewal) was retired on March 1, 2012 for two years with a retired expiration date of 3/31/2014, then if the license is reactivated on June 1, 2013, the contractor would be required to pay the 2012 renewal fees ($200) when bringing out of retirement and the license expiration date would remain the same as 3/31/2014 (after renewing the 2012 renewal). See"Forms and Downloads"if additional resources are needed to complete the renewal or see ourFAQ's. Contractor Revisions Amendments/Changes To Existing License Section 4. View all Residential Contractor License Types General Contractor Licensure. If submitting a change at the time of renewal, it may be delayed since the Board must review at their regularly scheduled meetings. Build residential houses only, take the BC-A exam. FEES PAYABLE TO: "STATE OF TENNESSEE" DO NOT USE THIS FORM FOR THE FOLLOWING : Renewal Fee $200.00 Retirement Qualifying Agent ( QA) Change Monthly Late Fee * $20.00 License Revision (Class / Limit / Name / Mode ) Change of Ownership * Contact theDepartment of Revenuefor obtaining a local Business tax license for each city or county where you plan to perform work. Request information on this class. Medical Gascertification is required by the American Medical Gas Institute (AMGI) or the Piping Industry Progress and Education Trust Fund (PIPE), with a minimum of 32 hours of training, with eight (8) of these hours in brazing. 0
hbbd```b``"WH&) f5A${;X}6l`` zg0;DrH 2 DH8d bl + Heavy Construction (HC)such as: Marine (Docks, Harbor Improvements) HC-A; Dams, Dikes, Levees and Canals (HC-D); Structural Steel Erection (HC-1); Clearing, Grubbing, Snagging and Rip Rap (HC-5); Storm Damage Restoration. Gas piping: A contractor with CMC, CMC-A or CMC-C may perform gas piping to everything, such as water heaters, laundry equipment, kitchen equipment, and to appliances, gas grills, swimming pool heaters, or gas logs. However, if the contractor fails to apply for a license within this time period and remains active in the construction industry, such as performing projects where a license is not required (under $25,000), or working for another licensed contractor, or in another state, etc., then the Board may accept the scores after the two year period. In order to obtain aContractor'slicense (required for projects $25,000 or more), the following is the "Application" and "Exam" information to download and print or you may call our office at 1-800-544-7693 and we will be happy to mail you an application package: The above items are needed to obtain a contractor's license. Out-of State corporations must register as a foreign corporation and submit a copy of their Charter, along with a copy of their Certificate of Authority showing they have registered their charter (we may accept a copy of their application stamped "FILED" from the Tennessee Secretary of State's office in order to meet the 20th deadline). An interview may be required with a Board member at the regularly scheduled meeting (see "Calendar" for meeting dates) for those not meeting the criteria to have the interview waived (see "Waiver of Interview" below). For example, an electrical contractor is typically interviewed by a Board member experienced in the electrical field. The license is obtained in the name of the entity providing the financial statement. Confidential Records - Financial statements and indemnities are not considered public records.
Reciprocity - MSBOC Retirement Plans, specifically an IRA, 401K and Profit Sharing, will be allowed at 50%, Cash surrender value of life insurance policies, Trade accounts receivable and notes and other receivables that are expected to be collected within one year (if this amount represents the majority of working capital, the Board maynotutilize the full amount without a guaranty and personal financial statement). Renewal license fees - $50 Reinstatement (expired more than 3 months) fees - $75 Mailing Address Mail your completed application to: Tennessee Board for Licensing Contractors 500 James Robertson Pkwy. If you have moved, state mail is not forwarded. Electrical wiring contracts inexcess of $25,000, need the CE exam. About the Board . Contractors with a "Retirement" status are considered "Inactive" and not licensed to perform work in an amount where a license is required; Bookstores(Code Books and Reference Manuals for Exams). Those needing a license revised prior to the Board's next meeting may qualify as a"Hardship"(request for early/emergency review) if attending the regular scheduled meeting would cause an undue hardship on the applicant and be in the best interest of the public safety and welfare. If licensed as a Corporation or LLC, ensure the status is active with the Tennessee Secretary of State's office at: Balance Sheet did not list assets and liabilities (current and non-current), Financial Statement is not in the name as licensed, Name Change or Mode Change may be requested to the Board by completing a license revision form(it is encouraged to do so prior to renewing), Working Capital and Net Worth do not support monetary limit on license. The interview is informal and takes no longer than 30 minutes. Law Change - July 1, 2007 (Merged with Contractors Board), Lead Based Paint - Contractor Handbook (EPA). 62-6-135. At the "License Search", the license status will show "Active" with an expiration date; classification; an the monetary limit assigned to the license.
Business License | City of Franklin, TN State Licensing Board for Residential and General Contractors | Georgia The same person taking the Business and Law is not required to take the trade exam. Reciprocity is atrade exam waiver, only. To earn a Full Mechanical Contractor (CMC) license or a Plumbing & Gas Piping (CMC-A) license, the application fee is $250.
Tennessee License Lookup | License Lookup Once completed, the form provides the information necessary to create a record of your business; classify the business; and issue a license. See"Public Meetings Calendar"for dates. STEP 4 - PROOF OF INSURANCE. The contractor MUST comply with all other application requirements, as the examination, only, is waived. *ABondin the Board's format may be suppliedin lieu of the Guaranty Agreement, in the amount of $500,000; or $1,000,000 for an Unlimited monetary limits. Forms . NON-CURRENT ASSETSare the following and not current assets, since they generally are not expected to be converted into cash within one year: *The Board may accept a Guaranty Agreement from stockholders or related parties, supplied with their financial statement, to consider counting this as a current asset. Construction Manager is required to take the full BC exam.
Find A Regulation - Tennessee For questions concerning your renewal or to send missing documents, the Board's renewal section may be contacted by email at:Contractor.Renewal@tn.gov. If you experience problems with PSI, the exam vendor, you may report these complaints to our staff by email at:Contractors.Home-Improvement@TN.Gov. Expiration of indemnities occurs at renewal time (no more than 2 years). Municipal Utility (MU)such as: Underground Piping (MU-A); Grading and Drainage (MU-C); Gas Distribution and Transmission Lines (MU-A,1). Books may be shipped for overnight delivery. Out-of-state contractors may register with PSI to take exams at any of their exam centers (offered in over 26 states). Prepaid expenses such as insurance, interest, rents, taxes, etc. You will be mailed a license certificate which will have your license ID number, classification, expiration date (this is the same information required to be on the outside of a bid envelope!) No annual tax return is required. Process Piping - covers welding of the piping system; NO test, (CMC-B) classification. The Secretary of States office may be contacted at (615) 741-2286 or visit theirwebsite. See"Public Meetings Calendar"for dates.
Tn Contractors License Application Form - signNow Cannot use a family member's reference. There is a 7-day grace period for late fees on the first month. The Board meets during the months of January, March, May, July, September and November. in lieu of sending by mail. Trade Exams This guide contains information about construction industry licensing in Tennessee. CURRENT LIABILITIESare obligations whose liquidation is reasonably expected to require (a) the use of current assets or (b) the creation of the other current liabilities. You may need toDOWNLOAD a free copy of Adobe Readerto view these files. Therefore, some contractors will be seen earlier. See more information below in the "Summary of Contractor License Requirements". Renewals should be submitted to the Board's office30 days prior to the expiration date. Always allow30 daysfor processing! Build homes and commercial projects, (such as a doctors office, less than $750,000), need the BC-A and BC- b(sm) exams OR may take the combined BC-A,b(sm). TENNESSEE SECRETARY OF STATE Deadline:Contractor's license applications must be received by the Board office prior to the deadline date which is the20th of the month prior, to the Board meeting. Example: A contractor with classification "S-Food Service Equipment" would be required to hire a licensed mechanical contractor to perform refrigeration portions in excess of $25,000. Contact: 800-952-0910, McMinnville TCAT (Tennessee College of Applied Technology If submitting online, attesting does not require a notary. Pending Renewals:Renewals received which lack the required financial supporting documentation, our staff will notify the contractor after the audit with options. To obtain the annual license remit an application along with $15 to the Customer Service Dept. Working capital is current assets minus current liabilities. Exam Information - Candidate Information Bulletin[pdf]
TN Building Contractor Registration (BC) City of Knoxville - "OneStop Resource", Duplicate License Certificate - Request Form, FEIN / EIN - Federal Employer Identification Number, Workers' Comp Exemption Registry as Construction Services Provider, Section 2. The insurance and financial statement is not required to place a license in retirement. These should be submitted assoon as completing the online renewal and may be sent to our. Completing Your Renewal Application Be sure to complete your renewal application carefully. The license is issued for two years. Examples of the 34 building subcategories: BC- 7 (Institutional and Recreational Equipment); *BC-17 (Elevators, Escalators, and Dumbwaiters); BC-27 (Outdoor Advertising); BC-29 (Landscaping); BC-28-Excavation; BC-31 (Demolition); etc. Renewal Process:Board office conducts an audit, which includes: 1) checking the financial statement to ensure the working capital and net worth supports the current monetary limit; 2) checking for proof of insurance and making sure coverage includes Tennessee; 3) Corporate status is confirmed; and 4) check to see that the "Contractor's Affidavit" was completed, signed and notarized. In some cases, may need our stateLLE(Limited Licensed Electrician) license for permits and inspections. The license belongs to the owner of the entity providing the financial statement, therefore, it does not necessarily belong to the Qualifying Agent (QA), unless they are also the owner. If bringing a contractor's license out of retirement during the second year of the renewal cycle, the law does not provide a means to waive one year of the renewal fee. See more information for"Hardship Criteria". The license does not have to be reinstated the same as it was prior to expiring.